LATEST PUBLICATIONS
PIDS EPM 2020-2021
Reset and Rebuild for a Better Philippines in the Post-pandemic World
DLSU-AKI Working Paper Series 2021-11-079
Examining and Evaluating the Multidimensional Energy Poverty Index (MEPI) in the Philippine Household Context
DLSU-AKI Working Paper Series 2021-11-078
A Game Theoretic Study on CSR and Government Intervention for Sustainable Production
DLSU-AKI Working Paper Series 2021-11-077
Obstacles to Economic Freedom Affecting Micro, Small, and Medium Enterprises (MSMEs) in Southeast Asian Countries

LATEST AV MATERIALS
PIDS WB 2021-1104
Assessing the Philippines' Performance in Meeting the ASEAN Economic Community Vision 2025
PIDS WB 2021-1103
Examining The Health Impacts Of The COVID-19 Pandemic In The Philippines
ILS-AVP-01
ILS 30th Anniversary Video
PIDS WB 2021-1102
Evaluating the Pantawid Pamilyang Pilipino Program's Payment System
Publication Detail
DP 2012-21: Finding Solutions to the Mindanao Electric Power Problem

The Mindanao electric power problem, which led to a crisis situation in summer 2012, is primarily due to inadequate baseload capacity and unbalanced generation capacity mix. The crisis might stage a comeback when the days of relatively cooler weather and heavier rainfall are over and the annual system peaks, which can be expected in summer 2013, kick in once again. The short-term recommended actions are as follows: continue the rehabilitation and sustain the operations of Agus and Pulangui hydropower complexes; minimize the bureaucratic hurdles in the building up of electric cooperatives` embedded generation capacities but only up to the extent allowed by law; undertake a more aggressive information, education, and communication campaign in Mindanao regarding the power situation and power outlook; and address the risk aversion problem in baseload power contracting.

In the medium to long term, the possible policy responses include the following: decide with finality the fate of the privatization of Agus and Pulangui hydropower complexes and include the concession option in the range of options; facilitate the entry of new baseload capacity commitments and if no new investments would come in, the government could also explore a concession arrangement; accelerate the development of renewable energy projects through quick action in rules setting; strengthen the capacity of the regulator to deal with complex issues in the electric power industry; and pursue the interconnection of the Visayas and Mindanao power grids.



Philippine Institute for Development Studies
Authors Keywords
Navarro, Adoracion M.; privatization; Philippines; electric power; power generation; concessions;
Download PDF Number of Downloads
Published in 2012 and available in the PIDS Library or Downloaded 1,591 times since October 08, 2012
×
Please let us know your reason for downloading this publication. May we also ask you to provide additional information that will help us serve you better? Rest assured that your answers will not be shared with any outside parties. It will take you only two minutes to complete the survey. You will answer the profile questions only once as long as you enter the same email address. Thank you.


To use as reference:
If others, (Please specify):
Name: (optional)
Email: (required, but will not display; please use the same email address when downloading another publication so that the profile questions will not appear)
Age:
Gender:
If Prefer to self-describe, please specify:
Level of Education:
Occupation:
If employed either part-time or full-time, name of office:
If others, (Please specify):
Would you like to receive the SERP-P UPDATES e-newsletter? Yes No
Use the space below if you have any comment about this publication or SERP-P knowledge resources in general.