Philippine Standard time

The Need to Challenge the Private Sector Fundamentalism of the IFIs in Power Sector Program


In the 1990's, fundamental power sector restructuring swept developing countries around the world, starting with private sector participation in public utilities (e.g. Build-Operate-Transfer modalities) and ending with outright privatization. At each step the heavy hand of the World Bank and the Asian Development Bank guided the governments. This paper points to the growing evidence that the ADB and the World Bank-supported power restructuring policies resulting in higher electricity prices for consumers, greater probability of private market power in the sector, less environmental protection, less consumer protection, and legitimating of wrong policies and corruption. The was presented at the Privatization of Infrastructure Seminar held 5-6 January 2003 in Hyderabad, India as part of the Asian Social Forum

Citations

This publication has been cited time(s).



Related Publications

Market Power in the Philippine Power Market

UPSE
UPSE DP 2009-09
2009
369 Downloads

Republic Act No. 7305: the Magna Carta of Public Health Workers

UP-NCPAG
NCPAG PJPA 2007-1-4
2007
153 Downloads
Cite
Downloads

438

Since
Jul 03, 2013

More Publications from Action for Economic Reforms
2009
549 DOWNLOADS
2007
519 DOWNLOADS