LATEST PUBLICATIONS
DLSU-AKI Working Paper Series 2020-10-059
Does Partner Satisfaction Influence Contraceptive Use? Findings from the Philippines National Demographic and Health Survey 2017
DLSU-AKI Policy Brief, Volume VII, No. 5
Can the Gender Wage Gap be Closed in the Philippine Manufacturing Sector?
DLSU-AKI Policy Brief, Volume XIII, No. 8
Will CREATE Resolve the Philippines' Unemployment Woes Amidst the COVID-19 Pandemic?
DRN 2020-03 Vol. 38 No. 2
Expert flags fiscal risk in SC ruling on LGU revenue share
Publication Detail
PN 2020-01: Examining the Implementation of PBB Scheme in the Public Sector

In 2012, the government adopted a Performance-Based Incentive System, composed of the productivity enhancement incentive and the performance-based bonus (PBB), to reward exemplary performance of employees in the public sector. This Policy Note examines how the PBB scheme is implemented in three sectors of public service. The study finds, among others, that while there was a general strong support for its continuation, many lamented on the increasing number of PBB requirements over time. In the education sector, there was no proper dissemination of information on the PBB scheme at the school level. However, the study finds that the PBB scheme strengthened team work among employees. Government personnel became more aware of their responsibilities and deadlines and exercised more accountability for each other. It also noted unintended consequences of the incentive program, such as jelousy among employees, perception of arbitrary ratings, increased tendency to render overtime, and unnecessary competition among staff. To enhance the effectiveness of the PBB scheme, the study suggests for the government to institute changes in the PBB requirements less frequently and only after ample preparation for cascading information. It is also critical that reform and capacity-building roadmaps in each agency be synched with the PBB targets.

Philippine Institute for Development Studies
Authors Keywords
Albert, Jose Ramon G.; Mendoza, Ronald U.; Cuenca, Janet S.; Muņoz, Mika S.; Performance-Based Incentive System; productivity enhancement incentive; performance-based bonus (PBB); public service; capacity-building ;
Download PDF Number of Downloads
Published in 2020 and available in the or can be downloaded as full text Downloaded 293 times since January 28, 2020